AG Signature Kitchens
Custom Cabinetry & Millwork
Storage built around what you own, not around what happened to fit.
Stock cabinets arrive in three-inch increments, so the gap between the last cabinet and the wall gets covered with a filler strip. Multiply that across a kitchen and you have paid good money for several feet of nothing.

Why it matters
The difference
you live with.
Built to size, that same space becomes a spice pull-out, a tray slot, a cupboard that finally holds the vacuum upright. The difference is not luxury. It is that everything you own has somewhere to go, and the mixer stops living on the counter.
What changes
What it means
for you.
Every inch does something
No filler strips, no dead corners, no cabinet you cannot reach the back of.
Built to your actual ceiling
Cabinets run to the real height of your room instead of stopping short and collecting dust on top.
It still opens properly in ten years
Hardware and joinery rated for decades of daily use, because that is exactly what a kitchen is.
And underneath
all of it.
Measured after the boxes are set and level, never before. That is why the doors line up.
Scoped line by line before you sign, and quoted from the same rate sheet whatever the zip code. The AG Standard
Inspected, not assumed
Nothing gets
covered up
on trust.
The parts of a renovation you will never see again are the parts that decide whether it lasts — the framing behind the drywall, the waterproofing under the tile, the connections above the ceiling. Once they are covered, you are trusting that somebody looked.
Somebody looked. Every stage of every trade is reviewed by the Project Manager against a written standard before it can be marked complete, and photographed into our app as it happens. Anything that does not meet the standard is corrected before the wall closes — and either way, there is a photograph of it.
What that gets you
What you
never worry about.
The hidden work is documented most
The stages that disappear behind finishes get photographed most heavily, not least. There is a record of what is actually inside your walls.
The same check on every job
A written standard means the inspection does not depend on which Project Manager you got, or how busy that particular week was.
A record that stays yours
Every stage and every photograph stays with your project — so in ten years you can still see exactly what was done, and how.
Your project, visible
Know what happened
at your house today,
without calling anyone.
Most of the stress in a renovation is not the work. It is the not knowing — whether anybody showed up, whether the date moved, whether the thing you asked about last Tuesday actually got handled.
So we built our own app and gave you a seat in it. You see what happened on your property today in photographs, exactly where the schedule stands, every movement in that schedule and why it moved — and what is scheduled to happen for the next two weeks.
What that gets you
What you
will see.
Today, in photographs
Every day's work documented on site as it happens, not summarized later from memory.
The schedule, and every time it moves
You see the movement and the reason for it the day it happens — not at the end of the month.
The next two weeks, always
You always know what is coming, so you can plan around it instead of being told after.
Our guarantee
5%On time, or 5% back.
We deliver your project through the final checklist by the completion date on your signed schedule — or we take 5% off the entire project.
Not 5% of the delay. 5% of the whole job.
Almost every contractor gives you a date. Almost none of them put their own money behind it. We can, because the schedule is not a hope — it is built in planning, watched every day, and reviewed against the written standard at every stage.
Rated by the people who hired us
Five stars,
everywhere that counts.
Reviews live on the platforms themselves, not just on our own website.
In their words
What it was like
to work with us.
Video from clients on their own projects, and written reviews from the directories where anyone can check them.

Client story

Client story

Client story
Awaiting a real review from this platform.
—
Awaiting a real review from this platform.
—
Awaiting a real review from this platform.
—
Questions
Asked and
answered.
What's the difference between custom and semi-custom cabinets?
Custom cabinets are built from scratch to any size and specification. Semi-custom uses curated door styles and finishes with flexible sizing — a refined look at a smarter investment and faster lead time.
Is cabinet refacing worth it?
If your layout works and your boxes are sound, refacing or refinishing can transform the look for a fraction of the cost and time of new cabinetry. We'll tell you honestly which path fits your kitchen.
How long do custom cabinets take to build?
Custom cabinetry typically takes six to ten weeks to fabricate, which we schedule alongside the rest of your remodel so install lands right on time.
Service area
Custom Cabinetry
near you.
113 communities across Dallas–Fort Worth.
Start a project
Tell us what
the house needs.
Send the address, a few photos and the rough idea. We will prepare a Feasibility Report before you have spent a dollar.